武漢盤龍正榮府(示范區(qū))展示中心照明工程——2021神燈獎申報工程

大件事要分享到:
2021-03-10 70

摘要:武漢盤龍正榮府(示范區(qū))展示中心照明工程,為北京光影國際照明設(shè)計2021神燈獎申報工程。



  項目名稱:武漢盤龍正榮府(示范區(qū))展示中心照明工程


  此項目為2021阿拉丁神燈獎工程類參評項目


  申報單位:北京光影國際照明設(shè)計


  項目地址:湖北省武漢市黃陂區(qū)盤龍大道


  設(shè)計單位:北京光影國際照明設(shè)計


  施工單位:金龍騰裝飾股份有限公司


  業(yè)主單位:正榮地產(chǎn)-武漢正舟置業(yè)發(fā)展有限公司


  項目簡介


  融情于景,融匠心于建筑。建筑精研城市文化,采用具有張力的、現(xiàn)代化的建造風(fēng)格,石材和金屬的搭配給予了建筑深刻的視覺感受,配合現(xiàn)代感極強(qiáng)的玻璃材質(zhì),使建筑整體虛實(shí)結(jié)合的手法更加明確;
建筑形態(tài)的展現(xiàn)、材質(zhì)的選擇呈現(xiàn)其建筑特色形象的同時, 也為周邊提供了一種全新的生活場所,契合項目所處區(qū)域的發(fā)展趨勢。

Melt in the scene, melt craftsmanship in the building. Elaborate on urban culture, the building adopts a tension and modern construction style. The collocation of stone and metal gives the building a profound visual feeling. With the strong sense of modern glass material, the technique of combining the virtual and the real in the whole building is more clear.

The display of architectural form and choice of materials presents its architectural acteristic image, but also provides a new living place for the surrounding area, which conforms to the development trend of the area where the project is located.











項目宣傳視頻:

  照明技術(shù)指標(biāo)


  線形燈:功率15W 色溫4000K 數(shù)量100米
線形投光燈:功率24W 色溫4000K 數(shù)量46米
LED柔性燈帶:功率9.6W 色溫4000K 數(shù)量130米
嵌入式筒燈:功率10W 色溫3000K 數(shù)量21套
定制壁燈:功率18W 色溫4000K 數(shù)量5套
LED投光燈:功率3W 色溫4000K 數(shù)量4套

供配電系統(tǒng)
1.本工程為220/380V供配電系統(tǒng),采用放射式供電方式;
2.計量:夜景照明配電系統(tǒng)均在上級配電箱(柜)進(jìn)行計量;
導(dǎo)線選擇和線路敷設(shè)
所有供配電線路和控制線路必須按設(shè)計規(guī)范要求穿厚壁熱鍍鋅鋼管或金屬線槽敷設(shè),任何地方都不能出現(xiàn)裸導(dǎo)線的情況,更不能把供電線路直接埋在地面和墻體內(nèi);
2. 照明線路采用WDZB-YJY-1.0KV銅芯無鹵低煙B級阻燃交聯(lián)聚乙烯絕緣電力電纜;低壓線路采用ZR-RVV阻燃銅芯電纜;
3. 電纜分支或有破開處須設(shè)防水接線盒并離地0.3m安裝;敷設(shè)管線應(yīng)在適當(dāng)位置加拉線盒(直線:30m,一個彎:20m,二個彎:15m,三個彎:8m);4.管線埋地敷設(shè)時埋地深度不小于0.7m,在寒冷地區(qū)電纜宜埋設(shè)于凍土層以下;所有穿過建筑物伸縮縫、沉降縫、后澆帶的管線應(yīng)按《建筑電氣安裝工程圖集》中有關(guān)作法施工;
設(shè)備要求:
1)照明設(shè)備所有帶電部分應(yīng)采用絕緣、遮攔或外護(hù)物保護(hù),距地面2.8m以下的照明設(shè)備應(yīng)使用工具才能打開外殼進(jìn)行光源維護(hù);
2)室外安裝照明配電箱與控制箱等應(yīng)采用防水、防塵型,防護(hù)等級不應(yīng)低于IP54;
3)室外配電箱內(nèi)元器件應(yīng)考慮室外環(huán)境溫度、濕度的影響,距地面2.8m以下的電氣設(shè)備應(yīng)借助于鑰匙或工具才能開啟;
4)LED燈具應(yīng)選用專用開關(guān)電源,LED燈具輸入電壓應(yīng)與開關(guān)電源輸出電壓一致;
5)在正常視角范圍內(nèi)的光源可直視燈具,必須采取有效防眩光措施;
6)對人員可觸及的照明設(shè)備,當(dāng)表面高于60℃時,必須采用隔離保護(hù)措施;
7)燈具、附件及電氣設(shè)備滿足項目所在地氣候環(huán)境條件下正常工作;
8)夜景照明燈具防護(hù)等級必須滿足消防安全要求;室外雨棚嵌入式筒燈防護(hù)等級不低于IP44,水下燈防護(hù)等級不低于IP68等;
9)所有I類燈具均設(shè)置地線接地保護(hù);
10)燈具功率因數(shù)不應(yīng)低于0.9,以減少線路損失,確保供電質(zhì)量及光源效率.
時間控制器系統(tǒng)要求:
1)開、關(guān)時間任意可調(diào);
2) 已調(diào)好的開、關(guān)時間不受停電影響,自動記憶;
3)每天可做十次開、關(guān)動作,開、關(guān)時間一周內(nèi)可任意編程;
4)可自動,也可手動控制,設(shè)有自動保護(hù)裝置;
5)內(nèi)消耗功率低;
施工安裝要求:
1)夜景照明燈具及配套電器、開關(guān)電源、控制器等電氣設(shè)備禁止安裝在可燃材料表面;
2)開關(guān)電源、各種控制器必須按照施工設(shè)計規(guī)范要求安裝在金屬外殼的箱體內(nèi),不得埋在地面和墻體內(nèi);
3)燈具的電纜電線接頭應(yīng)端子連接或涮錫連接、并做防水處理;
4)為了保證安裝強(qiáng)度和防止雨水腐蝕,燈具安裝支架、固定螺絲應(yīng)全部為不銹鋼或鋁合金材質(zhì);
5)燈具、管線及電氣設(shè)備布置不得影響消防安全疏散與救援;
6)室外燈具外殼顏色應(yīng)與安裝部位表面顏色協(xié)調(diào);外立面夜景照明燈具及布線應(yīng)做到不外露、不易觸碰到,主立面嚴(yán)禁外露;
7)所有供配電線路和控制線路必須按設(shè)計規(guī)范要求穿厚壁熱鍍鋅鋼管或金屬線槽敷設(shè),任何地方都不能出現(xiàn)裸導(dǎo)線的地方,亦不可直埋于地面或者墻體內(nèi);
8)施工滿足項目所在地的地方標(biāo)準(zhǔn)及施工規(guī)范要求;
Linear lamp: power 15W color temperature 4000K quantity 100 meters

Linear projection lamp: power 24W, color temperature 4000K, quantity 46m

LED flexible light strip: power 9.6W color temperature 4000K quantity 130 meters

Embedded down light: power 10W color temperature 3000K quantity 21 sets

Custom wall lamp: power 18W color temperature 4000K quantity 5 sets

LED projection light: power 3W color temperature 4000K Quantity 4 sets



Power supply system

1. This project is 220/380V power supply and distribution system, using radiation power supply mode;

2. Metering: Nightview lighting distribution system are measured in the superior distribution box (cabinet);

Conductor ion and circuit laying

All power supply and distribution lines and control lines must be laid through thick wall hot dip galvanized steel pipe or metal trough according to the requirements of the design specification. Bare wires can not appear anywhere, let alone the power supply lines directly buried in the ground and walls;

2. The lighting line adopts WDZB-YJY-1.0kV copper core halogen-free low-smoke B-grade flame retardant XLPE insulated power cable; ZR-RVV flame retardant copper core cable for low voltage line;

3. Water proof junction box shall be set up at cable branch or broken place and shall be installed 0.3m above the ground; The pipeline should be laid in the appropriate position of the wire box (straight line: 30m, one bend: 20m, two bend: 15m, three bend: 8m); 4. The buried depth of the pipeline should not be less than 0.7m when it is laid in ground. In cold areas, the cable should be buried under the permafrost; All the pipelines through the expansion joints, settlement joints and post-cast belts of the building shall be constructed according to the relevant practices in the Atlas of Building Electrical Installation Engineering;

Equipment requirements:

1) All live parts of the lighting equipment should be protected by insulation, shielding or external protection. The lighting equipment below 2.8m the ground should use tools to open the shell for light source maintenance;

2) Outdoor lighting distribution box and control box should be waterproof and dustproof, and the protection grade should not be lower than IP54;

3) The components in the outdoor distribution box should consider the influence of outdoor environment temperature and huity, and the electrical equipment below 2.8m the ground should be opened with the help of keys or tools;

4) LED lamps should use special switching power supply, and the input voltage of LED lamps should be consistent with the output voltage of the switching power supply;

5) The light source within the normal viewing Angle can look directly at the lamp, and effective anti-glare measures must be taken;

6) For lighting equipment accessible to personnel, when the surface is higher than 60℃, isolation protection measures must be adopted;

7) The lamps, accessories and electrical equipment should work normally under the climatic and environmental conditions of the project location;

8) The protection level of nightview lighting fixtures must meet the fire safety requirements; The protection level of outdoor canopy embedded downlight should not be lower than IP44, and the protection level of underwater light should not be lower than IP68;

9) All Class I lamps are equipped with ground wire grounding protection;

10) The power factor of the lamp should not be less than 0.9 to reduce the line loss and ensure the quality of power supply and the efficiency of the light source.

Time controller system requirements:

1) Opening and closing time can be adjusted;

2) The adjusted on and off time is not affected by power failure, and it can be automatically remembered;

3) Can do 10 times a day on and off action, on and off time within a week can be arbitrary programming;

4) It can be controlled automatically or manually, and equipped with automatic protection device;

5) Low internal power consumption;

Construction and installation requirements:

1) Nightview lighting lamps and supporting electrical appliances, switching power supply, controllers and other electrical equipment are prohibited to be installed on the surface of combustible materials;

2) Switching power supply and various controllers must be installed in the box of the metal shell in accordance with the requirements of the construction design specification, and shall not be buried in the ground and wall;

3) The cable and wire connectors of lamps and lanterns should be connected with terminals or dipping tin, and waterproof treatment;

4) In order to ensure the installation strength and prevent rain corrosion, the mounting bracket and fixing screws of the lamp should be made of stainless steel or aluminum alloy;

5) Layout of lamps, pipelines and electrical equipment shall not affect fire safety evacuation and rescue;

6) The exterior lamp shell color should be in harmony with the surface color of the installation part; External facade night lighting lamps and wiring should be not exposed, not easy to touch, the main facade is strictly prohibited exposure;

7) All power supply and distribution lines and control lines must be laid through thick-walled hot-dip galvanized steel pipes or metal grooves according to the requirements of the design specifications. No bare wires can be found anywhere, nor can they be directly buried in the ground or walls;

8) The construction shall meet the local standards and construction specifications of the project site;


  節(jié)能措施及效果


  項目設(shè)計:燈光為建筑服務(wù),用適量的燈具針對建筑做合適的照明。
產(chǎn)品運(yùn)用:貼合綠色照明,每款燈型確保功率合適,無運(yùn)用大功率燈具;同時極大地減少了視覺上的曝光點(diǎn)及過度照明。
控制模式:采用成熟的時間控制模塊,將建筑照明分為夜晚和深夜兩種模式(夜晚燈光狀態(tài)全開深夜只保留基礎(chǔ)功能),照明內(nèi)消耗功率低;
Project design: lighting for the service of the building, with the right amount of lamps for the building to do appropriate lighting.

Product application: fit green lighting, each lamp type to ensure appropriate power, no use of high-power lamps; It also greatly reduces visual exposure points and overillumination.

Control mode: a mature time control module is adopted to divide the lighting of the building into two modes: night and late night (the lighting is fully switched on at night and only the basic functions are retained at night). The power consumption in lighting is low.


  照明設(shè)計創(chuàng)新點(diǎn)


  照明設(shè)計思路的轉(zhuǎn)變:營銷中心不再僅僅是傳統(tǒng)的銷售場所,“體驗(yàn)”是新消費(fèi)場景的核心;去“銷售”化的售樓處,多了些趣味、少了些功利,讓人們在各類極致的體驗(yàn)中,自然而然地加深了對項目的理解、認(rèn)可以及對新生活的暢想;而燈光的介入是對建筑結(jié)構(gòu)的描繪、對氛圍的渲染、對體驗(yàn)感的提升。

The transformation of lighting design idea: marketing center is no longer just the traditional sales place, "experience" is the core of the new consumption scene; To the "sales" of the sales office, more interesting, less utilitarian, so that people in all kinds of extreme experience, naturally deepen the understanding of the project, recognition and imagination of the new life; The intervention of light is to describe the structure of the building, to render the atmosphere, to enhance the sense of experience.


  項目實(shí)際運(yùn)行評價


  我司于2019年11月22日至2020年07月20日進(jìn)行“武漢盤龍正榮府”示范區(qū)項目燈光設(shè)計及驗(yàn)收調(diào)試工作;通過現(xiàn)場檢測、調(diào)試等方式,現(xiàn)場燈具安裝齊全,燈具無損壞,功率及照射角度滿足設(shè)計需求,各回路供電正常,調(diào)光回路運(yùn)行正常,符合甲方設(shè)計需求。

Our company in November 22, 2019 solstice on July 20, 2020 "Wuhan Panlong Zhengrong House" demonstration area project lighting design and acceptance debugging work; Through on-site inspection, debugging and other methods, the lamps and lanterns on site are fully installed, the lamps and lanterns are not damaged, the power and irradiation Angle meet the design requirements, the power supply of each circuit is normal, and the dimming circuit runs normally, which meets the design requirements of Party A.



  獲獎情況


  


  申報單位


  光影國際照明設(shè)計是由鄭志偉先生領(lǐng)銜的頂尖設(shè)計團(tuán)隊。十余年來,專注于光環(huán)境設(shè)計與研究,服務(wù)于商業(yè)地產(chǎn)、城市地標(biāo)、酒店會所、辦公康養(yǎng)、文旅小鎮(zhèn)等全球精品項目。以國際視野和世界領(lǐng)先的燈光方案,完成眾多視覺藝術(shù)與商業(yè)價值兼?zhèn)涞墓庥白髌贰?br/>
Light & Shadow International Lighting Design is a top design team led by Mr. Cheng Zhiwei. For more than ten years, we have been focusing on light environment design and research, serving commercial real estate, city landmarks, hotels, clubs, office health, cultural tourism town and other global boutique projects. With an international perspective and world-leading lighting solutions, he has completed numerous light and shadow works with both visual art and commercial value.